ABB 2769522-C Installation And Maintenance Manual page 23

Test adapter
Table of Contents

Advertisement

4.
Install a cable gland (9).
5.
Install the signal cable for the measuring
equipment, refer to the instructions from the
manufacturer.
6.
Make sure that the measuring equipment receives signals correctly.
7.
Make sure that the flexible rubber seal (8) has a
correct seal against the signal cable.
Installation and maintenance guide
1ZSC000563-ACD EN, REV. A, 2019-06-25
NOTE!
If the bushing is used outdoors: the
cable gland must be of
IP67 classification or better, and have a
flexible rubber seal (8).
NOTE!
The cable gland (9) must have
PG 22.5 threads.
Availble space for the cable gland is
Ø36 mm.
CAUTION!
Use a signal cable of sufficient size for
the amperage and voltage. Make sure
that the signal cable is rated for
outdoor use, and that it has the correct
shielding for this application.
CAUTION!
An incorrect seal will cause water to
leak into the terminal box.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1zsc003881-aac

Table of Contents