Installation; Checking Before Installation; Tool Preparation - Huawei SUN2000-15KTL-50KTL-M3 Series User Manual

Hide thumbs Also See for SUN2000-15KTL-50KTL-M3 Series:
Table of Contents

Advertisement

Replacing SUN2000-(15KTL-50KTL) Series with
SUN2000-(15KTL-50KTL)-M3 Series
User Manual

5.1 Checking Before Installation

Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter model is not
what you requested, do not unpack the package and contact your supplier as soon as possible.
Package Contents
After unpacking the inverter, check that the contents are intact and complete. If any damage is
found or any component is missing, contact your supplier.

5.2 Tool Preparation

Type
Tools and Instruments
Installa
tion
Hammer drill (with a Ф14
mm drill bit and a Ф16 mm
drill bit)
Issue 01 (2021-04-05)
You are advised to remove the packing materials within 24 hours before installing the inverter.
For details about the number of contents, see the Packing List in the packing case.
Torque socket and wrench
Copyright © Huawei Technologies Co., Ltd.
5

Installation

Torque wrench
5 Installation
32

Advertisement

Table of Contents
loading

Table of Contents