Starting The Pump - Stryker T/Pump Series Operation Manual

Localized temperature therapy system
Table of Contents

Advertisement

Available languages

Available languages

Starting the pump

WARNING
Always fill the pump reservoir with water before operating. Do not plug in the product until you fill the water reservoir.
Always plug the product into a hospital grade wall outlet.
Do not attach the power cord to any moving parts of the bed frame or any location that may pinch or cause power
cord damage. Improper routing can cause power cord damage and possible electrical shock.
Always set the temperature as directed by a physician.
Always use the T/Pump with Mul-T-Pad accessories. Do not use with competitor pads.
CAUTION
Federal law (USA) restricts this device to sale by or on the order of a physician.
Do not cover the product with blankets, pillows, or other insulating materials. Air flow is required to maintain system
performance.
Closely monitor the areas of body that are beneath the thermal transfer devices. Also check for areas of the body
for use of topical solutions, or other heat sources. These may interfere with the treatment prescribed.
To start the pump:
1.
Before filling the pump reservoir, attach a pad to the connector hose (see
page
1-9). Make sure that there are no kinks in the hose or pad.
2.
Open the hose clamps.
3.
Open the fill cap on the top of the pump.
4.
To fill for cooling
Fill with cold water to the Cooling water line.
Fill with ice to the full capacity of the reservoir.
Note: When using the pump for cooling, the ice will eventually melt and the setpoint will start flashing.
5.
To fill for heating, fill with room temperature water to the heating water line.
6.
Plug the pump into a properly grounded hospital grade wall outlet.
7.
Press the On/Standby button. The light next to the selected temperature begins to flash.
8.
Use the keypad to set the temperature as directed by the physician.
Notes
After setting the temperature, press and hold the Setpoint lock button for two seconds to lock the setpoint.
If you go past the desired setpoint, keep pressing the button to start at the beginning of the setpoint values.
It takes about 15 minutes to reach the selected water temperature. The light next to the selected temperature
becomes steady.
Check the water level. If the water level drops below the operating level, add water.
9.
Apply the Mul-T-Pad to the patient as directed by a physician.
10. Position the pump at or above the level of the pad.
Note: Do not place the pump below the pads, water will drain into the pump during shut off. If the pump has been
overfilled or if you connected multiple pads, excess water can leak.
www.stryker.com
Operation
Connecting single or multiple pads on
101515 REV E
English
EN
1-11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T/Pump Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Tp700Tp700c

Table of Contents

Save PDF