Installation; Installation To Motor - Siemens COMBIMASTER 411 Getting Started Manual

Hide thumbs Also See for COMBIMASTER 411:
Table of Contents

Advertisement

УП "Спецпривод-С". http://www.privod.by/. Email: info@privod.by, msv125@mail.ru
Адрес: Республика Беларусь, г.Полоцк, ул. Гагарина 8, комн. 304.
1

Installation

WARNING
!
Ø
THIS EQUIPMENT MUST BE GROUNDED.
Ø
To ensure safe operation of the inverter, it must be installed and
commissioned by qualified personnel in full compliance with the
warnings
MICROMASTER 411 operating instructions.
Ø
Take particular note of general and regional installation, and
safety regulations regarding work on dangerous voltage
installations (e.g. EN 50178), as well as the relevant regulations
regarding correct use of tools and personal protective gear.
Ø
Use Lifting Eyes provided if a motor has to be lifted. Do not lift
machine sets by suspending individual machines! Always check
Hoist capacity before lifting any equipment.
Ø
Do not paint over the black case finish of the inverter, as this will
affect the unit's thermal performance.
1.1

Installation to Motor

1.1.1
The Installation Kit should comprise the following items:
1. Inverter cover
2. Terminal Housing
3. Filter Module & screws
(captive)
4. Input – Output Board &
screws (captive)
5. Earth Lead
6. 10 Off Terminal Jumpers
7. Getting Started Guide and
CD
8. 2 off Glands M25 IP68 with
O-ring
Any defective or missing items should be reported immediately to your local
Siemens Distributor or Sales Office.
1.1.2
Note
MICROMASTER 411 ONLY:
Prior to installation it may be necessary to fit an Adaptation Plate to
a non-Siemens motor. The Adaptation Plate is prepared by the
respective motor manufacturer. Normally the Adaptation Plate
makes use of the existing motor gasket.
Physical dimensions and characteristics for installation of MICROMASTER 411
are given in Section 2.3.7 and in Section 2.4.2 for COMBIMASTER 411 of the
Operating Instructions.
With the product items removed from their packaging carry out the following
installation procedure (refer to Figure 3 for location of components):
1.
Separate the two halves (Inverter Cover and Terminal Housing).
2.
Remove the Filter Module and I/O board.
Caution
!
Do not knock out cable gland blanking plates unless the inverter
'electronics' (Filter & I/O boards) have been removed!
Getting Started Guide – March 2002
A5E00157510A
Тел.: 8 (0214) 444395, 443688, 442155, (029) 6171554
laid
down
Preparation
Installation Procedure
in
the
COMBIMASTER
9.
2 off M25 sealing plugs
10. 2 off M25 Gland Fixing Plates
11. 2 off U-clamp & screws (for
earth/ground connection)
12. 4 off M4 Inverter to Motor fixing screws
(CSC only: additional 4 off M5 screws)
13. Motor Cable Sheath
14. 1 off Motor Gasket (CSC only:
additional 1 off Motor Gasket)
15. 1 off M12 connector blanking plug
411
and
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micromaster 411

Table of Contents