1070080029 / 05
|
PST 6xx0
7.3
Connecting the water supply
Connection of a water supply is only necessary for water-cooled pro
ducts.
Please note the requirements on cooling in Section 3.2 starting on
"
page 194.
"
Make sure that the conditions required for cooling are complied with.
The respective information is provided in Sect. 15, starting on
page 309.
"
Use DIN threads in order to reach the necessary frictional connec
tion.
"
Press with flat spanner (SW 17) when you connect the hose nozzle
to the heat sink.
The mechanical construction of the cooling water connection is
identical for all PST timer types with water cooling. Only the position
of the connections may be different.
You will find the positions in Section 7.1.1 from page 256.
PST 6xxx
Heat sink
Coupled to PE con
ductor internally
Gasket ring
Fig. 47: Example: Cooling water connection
Electric Drives
|
Bosch Rexroth AG
and Controls
external
Hose nozzle
Fitting with standard inner taper ac
cording to DIN EN 560;
external thread M16 x 1.5;
through-bore ∅9
+0.5
Counterpart: Hose nozzle with coupling
nut M16x1.5 according to DIN EN 560.
Mat.: CuZn39Pb3 or Parker. Part order
no.: 35C82-10-6BK
281 / 330
Assembly
Coupling nut
M16x1.5