(Optional) Connecting the Air Duct
3.5
An air duct needs to be prepared onsite
based on site requirements.
When fixing the equipment to the floor,
place the bottom of the air duct on the
floor and use anchor baffle plates to
secure the air duct.
If the equipment is to be secured to the
base, it is recommended that you install
baffle plates on the base before securing
the bottom of the air duct.
Remove the eight screws from both sides
of the equipment.
Use M4x12 screws to secure the air duct
to the top of the equipment, and use
M6x25 screws to secure the both sides of
the air duct to the both sides of the
equipment.
4
Installing Pipes
4.1
Pipe Layout
1. A 1:100 tilt should be reserved for the drainpipe.
2. Keep a clearance of at least 25 mm between
pipes. Secure the pipes to supports every a
certain distance.
3. Clean the water inlet engineering pipes to avoid
impurities entering into the humidifier.
4. A reducing valve must be installed if the inlet
water pressure exceeds 0.7 MPa.
5. Pipes should be wrapped with thermal insulation
foam along the route.
4.2
Connecting the Drainpipe
Pipe
support
4
Unit: mm
Unit: mm