Upon Reception; What This Chapter Contains; Delivery Inspection; Unpacking Instructions - ABB PQFS Installation, Operation And Maintenance Instructions

Power quality filter
Table of Contents

Advertisement

3 Upon Reception

3.1

What this chapter contains

This chapter gives basic information on how to inspect, transport, identify and store the
PQFS active filter.
3.2

Delivery inspection

Each PQFS is delivered in a box designed to protect adequately the equipment during
shipment. Upon reception of the equipment, make sure that the packing is in good
condition. Verify the state of the shock and tilting indicators (if mounted on the
enclosure).
After removal of the packing, check visually the exterior and interior of your filter for
transportation damage.

3.3 Unpacking instructions

After removal of the top cover, check visually the exterior and interior of your filter for
transportation damage.
Your filter equipment comes with a package. Verify that all items are present, i.e.:
this manual
the electrical drawing
the rubber seal to cover a knock-out (to be used for multi-unit operation)
the communication cable needed for multi-unit operation
the two eyebolts
Any loss or damage should be notified immediately to your ABB representative.
3.4

Lifting and transportation guidelines

Please note that filter equipment weighs approximately 130 kilograms. Care should be
taken to ensure that correct handling facilities are used.
10 Upon Reception  Manual Power Quality Filter PQFS
Figure 1: PQFS packing material opened

Advertisement

Table of Contents
loading

Table of Contents