Basic Operations; Power On Sequence - Esko Kongsberg X Series User Manual

I-cut production console
Table of Contents

Advertisement

7

7. Basic Operations

7.1. Power On Sequence

Ensure the table is free from obstructions and ready for operation.
Follow these steps to power up the system and get ready to work:
1
2
3
4
5
38
Keep away from Moving Parts during operation.
Do not lean on Racks, Guide Ways or Traverse during operation, as this may cause
personal injury.
Before starting any operation, make sure that:
The Table is free from obstructions
No unauthorized personnel come close to the table
Front End PC
Switch on the PC and the monitor.
Table Power
Switch the table on using the Main Power Switch.
Note: After power off, wait minimum 5 sec. before the system is switched on
again.
iPC
From Desktop, double-click the icon for iPC
Check that no error message indicates faulty conditions.
Safety System
Reset the Safety System by pressing the Pause pushbutton.
Servo Power
Press the Servo On pushbutton.
Kongsberg X-series

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Kongsberg X Series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF