Table of Contents

Advertisement

Quick Links

Installation / Service Instructions
DS 1900
Gas Fireplace
For the latest documentation, visit www.escea.com
630503_7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DS 1900 and is the answer not in the manual?

Questions and answers

Summary of Contents for Escea DS 1900

  • Page 1 Installation / Service Instructions DS 1900 Gas Fireplace For the latest documentation, visit www.escea.com 630503_7...
  • Page 2 If these are not issued then the Escea warranty may be void. Warranty Repair and Annual Servicing: Please contact Escea if you require warrant work. Warranty repair work must be carried out by a recognised gas fire technician. It is recommended that recognised Escea Gas Fire Technicians are also used to carry out annual servicing requirements (particularly during the warranty period).
  • Page 3 2277mm Height 866 mm Appliance Dimensions (mm) Depth 380 mm Weight 160 kg Electronic Ignition to pilot system Ignition System Escea PCB Ignition Activation 35 secs (approx) Flame Safeguard Flame Rectification Consumption 160W @ 0.69A 230V Remote controls Timers Clock...
  • Page 4: Table Of Contents

    Product Description and Installation Process Product Description Recommended Install Process Product Dimensions Creating the Cavity Cavity Shape Designing the Cavity Hearth Cavity Base Wall Lining Television & Mantel Clearances Installing the Flue Flue Configuration (If less than 8m flue length is required) Flue Configuration (If more than 8m flue length is required) Installing the Horizontal Powerflue Wall Terminal option Installing the Universal Vertical Powerflue (Internal Install)
  • Page 5 Finishing the Installation Coal, Crystallite or Driftwood Fuel bed Installation Log and Woodland Log Fuel bed Retainer Setup Log Fuel bed Installation Woodland Fuel bed Installation Flame Picture Wall Linings Fitting the Bevelled Lite Fascia Locating Wall Mount Cradle for Wireless Control Operating the Appliance Normal Operating Sounds and Smells Installation Checklist...
  • Page 6: Product Description And Installation Process

    Product Description and Installation Process Product Description The Escea DS1900 gas fire is a room sealed gas appliance designed to be built into a false cavity. The appliance is flued using co-linear flexible aluminium flue. The user will control their fire with the Radio Frequency (RF) remote that will normally be located in its wall mount cradle.
  • Page 7: A3 Product Dimensions

    Product Dimensions NOT TO BE MISTAKEN FOR CAVITY DIMENSIONS All dimensions are in mm. 2277 ø ø 1942 Gas, power, & internet connections For more detail, view architectural drawings at www.escea.com or www.escea.com.au 630503_6...
  • Page 8: Creating The Cavity

    Note: These are minimum cavity framing dimensions and may not achieve a centred fireplace design in all specifications. Please adjust overall cavity size if required. Note: For masonry installations, clearance will be slightly larger to allow access to the electrical and gas connection points. Please contact the Escea advisory team at aa@escea.com. 630503_6...
  • Page 9: B3 Hearth

    Escea in no way guarantees or takes responsibility that the recommended installation suggestion will be suitable for all electrical or home entertainment appliances.
  • Page 10: Installing The Flue

    Flue Configuration (If less than 8m flue length is required) If your flue system is less than 8m long (as shown in diagrams below), then a simple aluminium flexible flue is required. If you wish to install a longer flue run, contact the Escea Advisory Team. Horizontally Terminated: Utilises the Escea horizontal power flue enclosure kit.
  • Page 11 Overall ue length: 1.2m Min. 8m Max. Vertically Terminated: Utilises the Escea universal vertical power flue enclosure kit. Vertical PowerFlue UVP Cowl Cowl (Duravent) 1.2m F-F Liner UVP Unit 1.2m Co-axial Flue Liner 8m MAX 8m MAX 8m MAX Internal...
  • Page 12: C2 Flue Configuration (If More Than 8M Flue Length Is Required)

    Flue Configuration (If more than 8m flue length is required) If your flue system is greater than 8m long (up to 40m long), then please contact the Escea Advisory Team at aa@escea.com for further guidelines. Installing the Horizontal Powerflue Wall Terminal option The horizontal powerflue wall terminal must be installed in the correct orientation (the small horizontal slot should be at the bottom).
  • Page 13 Creating the Hole in the Outside Wall When cutting the hole in the outside wall, be mindful of how the installation of the horizontal powerflue wall terminal will be finished; the installation must be weatherproof. Ideal Hole/Cavity Size for Horizontal Powerflue Without Side Brackets With Side Brackets 298mm...
  • Page 14 How to Flash the Horizontal Powerflue packer to lift terminal off sill The following diagrams are excerpts from the Escea architect drawings and are available in full on our flashing tape over wall wrap to opening website. These diagrams are recommendations, and your installation must comply with any local or...
  • Page 15: C4 Installing The Universal Vertical Powerflue (Internal Install)

    C4 Installing the Universal Vertical Powerflue (Internal Install) Note: For information regarding an external install of the UVP, go to section C5 on page 16. The Universal Vertical Powerflue (UVP) internal configuration is designed to have the fan, mounted within the roof space of the house, and the vertical Ø225mm diameter liner, containing a Ø100mm flexi, penetrate through the roof.
  • Page 16: C5 Installing An Universal Vertical Powerflue (External Install)

    The UVP-Internal kit is intended for use within an accessible roof space or ‘chimney’ construction. Service access must be provided. Ensure installation complies with relevant building codes and regulations Typical Installation UVP Cowl 1.2m F-F Liner ‘Decktite’ or similar ashing Roof Space Ensure Power Flue unit is securely braced using...
  • Page 17 Mount the UVP kit to the top of a chimney flashing plate or penetrate the roof with an optional flue liner accessory and fit the UVP kit over the flue liner, sealing the penetration with a decktite or similar flashing. Ensure the terminal is vertical and rigidly mounted, the flexi flue attached below is fixed to the terminal spigots using the supplied hose clamps.
  • Page 18: C6 Installing In Accordance With Relevant Codes

    C6 Installing in Accordance with Relevant Codes The location of the horizontal powerflue wall terminal must be installed in accordance with AS/NZS 5601 and any other relevant building codes. If possible, avoid installing the horizontal powerflue wall terminal in areas exposed to high winds and extreme weather. Some of the minimum clearances for a fan assisted wall terminal are listed below;...
  • Page 19: C7 Running The Flue

    Notes: 1) Should the flue not extend past the apex of the roof, the bottom opening of the flue should extend at least 200mm from the roof (or 300mm in regions with heavy snow). 2) The installation of a flue into a carport is not recommended. 3) The flue terminal will get very hot when in use.
  • Page 20 Run the powerflue electrical cable from the cavity where the appliance will be installed to the hole in the outside wall. Ensure it is not draped over, or in contact with, the outer shell of the appliance or the flues. The cable must be kept clear from any other possible heat sources, sharp edges, or moisture. Fix it appropriately and allow enough cable to be able to pull both the appliance and the powerflue terminal out from their installed positions.
  • Page 21: Installing The Electricity And Gas To The Appliance

    Installing the Electricity and Gas to the Appliance Power Supply While the cavity is being created, consideration must be given to the location of an appropriate power supply. An earthed 230/240 volt mains power connection (typically a standard 3 pin outlet) must be available within 1m of the bottom right of the appliance.
  • Page 22: D3 Gas Pipe Sizing

    D3 Gas Pipe Sizing Gas pipe should be sized as per the requirements of AS/NZS 5601.1. The pipe sizing must be sufficient to deliver the following volume of gas to the heater with all other gas appliances in the home running at the same time: Maximum DS1900 Gas Consumption = 49MJ/hr D4 Gas Pipe Position...
  • Page 23: D5 Gas Isolating Valve

    D5 Gas Isolating Valve A gas isolating valve must be installed in the gas line as close to the appliance as possible. Fix it in a convenient position to allow it to be closed off quickly and easily during normal operation. Take into consideration access to this valve once the wall linings are on.
  • Page 24: Installing The Appliance

    Installing the Appliance Connecting the Flue Access the top of the appliance and connect both the inlet flue (Ø75mm ID/85mm OD) and the exhaust flue (Ø100mm ID/110mm OD) to their respective spigots. Tighten the hose clamps onto the spigots. Ensure the flue connection is air tight.
  • Page 25: E5 Single Sided Front To Back Conversion (Only For Single Sided Fires)

    Single Sided Front to Back Conversion (only for single sided fires) 1. Follow sections E3 on page 24 and E4 on page 24 to remove the glass, infill, burners. 2. On the inside of the firebox, slightly loosen the firebox liner bracket (shaded in the diagram below) by loosening—not removing—the 3 screws (circled in the diagram below, quantity may differ with model).
  • Page 26 5. On the back of the appliance remove one screw from each of the four red tabs and set each pair of tabs from ‘open position’ to ‘close position’ (shown below). This is necessary to change the airflow path of the fire for a double sided conversion. Bend tab Bend tab Push tab in...
  • Page 27 7. Remove the bottom air deflector (shown shaded below). 8. Now remove the top bracket by unscrewing the 1/4 turn fasteners (circled below) and allow the panel to lean forward so you may lift the panel out. 9. Relocate the diagnostic bracket to the opposite side of the appliance by carefully removing the middle screw and feeding it through to the opposite side of the fire (as shown in the diagram below).
  • Page 28 11. Remove the bottom trim by pulling hard to release it from the appliance taking care not to scratch the side trims(shown below). 12. Remove the two side trims. These are fixed top and bottom with the low profile black self tapper screws (see below).
  • Page 29: E6 Gas Type Conversion

    NG to ULPG/Propane or vice versa. WARNING: The regulator that is supplied with the fire MUST NOT BE REMOVED. Removal of the regulator, or replacing it with one not intended for use with this Escea fire, will void the limited appliance warranty.
  • Page 30: E7 Operating The Appliance

    Step 4: Screw out the nylon adjuster screw inside the regulator to remove the existing spring. Replace the spring with the coloured spring supplied in the conversion kit and reassemble the regulator. Step 5: Stick the new gas type label supplied in the kitset on the underside of the tray hatch. Ensure the serial number and date of manufacture are still visible.
  • Page 31: E8 Checking The Gas Operating Pressure

    Note: The regulator that is supplied with the fire MUST NOT BE REMOVED. Removal of the regulator, or replacing it with one not intended for use with an Escea fire, will void the limited appliance warranty and may be dangerous.
  • Page 32 below) Once the operating pressure—post regulator—is set, check the operating pressure at test point A or D (shown in the first diagram of this section). Changing the Operating Pressure from the Remote The following instructions must only be undertaken by a suitably approved person.
  • Page 33: E9 Auxiliary On/Off Button

    The AUX button location can be seen in the diagram below. E10 Home Automation Setup Escea D-Series fireplaces have a simple interface for connection to a home automation system. This allows the fireplace to be woken up, started, and then shut down. The “Close to Wake” connection (shown below) is essentially taking one of the 3.3 volt DC pins on the fireplace micro controller and...
  • Page 34 From Automation system Connector and terminal block supplied by Escea The home automation connection can be found in your fireplace accessory pack (shown to the right). This connects to the fireplace via the lower RH outside panel of the fireplace, next to the primary network cable access point, as shown in section D2 on page 21.
  • Page 35: Finishing The Installation

    Finishing the Installation Coal, Crystallite or Driftwood Fuel bed Installation For the coal fuel bed only, begin by installing the three coal retainers, as shown below. They are installed by placing them on top of the infill and fixing them in place with the screws provided. For the crystalight, coal, or driftwood fuel beds, place all the crystallite/coal pieces in a single layer atop the burners and fuel bed tray.
  • Page 36 Looking at the underside of the infill, place the retainers as shown below and fix these in place with the screws provided. On completion, you can now re-install the infill, fuel bed, and glass to finish the replacement. NOTE: Screws to be fitted from the top side. W - B - LH1 - 1900 W - B - LH2 - 1900 Pilot...
  • Page 37 For Logs Only: the final log retainers are placed on TOP of the infill and burners to support the end log (number 2 from index). This part comes in flat form and is to be folded as per the image below. They are then installed on both outer sides of the infill and are fixed in place by 1 screw as below.
  • Page 38: F3 Log Fuel Bed Installation

    Log Fuel bed Installation Log Index Use the index above as a guide for selecting the correct logs. Place the flakes in a single layer evenly after the logs have been located correctly (excess flakes should NOT be added if one even layer has been achieved).
  • Page 39: F4 Woodland Fuel Bed Installation

    Woodland Fuel bed Installation Woodland Log Index Use the index above as a guide for selecting the correct logs. Place the flakes in a single layer evenly after the logs have been located correctly (excess flakes should NOT be added if one even layer has been achieved).
  • Page 40: F5 Flame Picture

    An abnormal flame pattern will likely be the result of incorrect settings (jet size, burner aeration collar). Check that these are correct before proceeding. If an abnormal flame pattern is still present, please contact Escea. It is the responsibility of the installer to ensure a correct flame pattern.
  • Page 41: F6 Wall Linings

    Wall Linings The final wall lining can only be commenced after all previous applicable sections have been completed. The appliance must be installed prior to and behind the finished wall surface. Allow clearance for any plasterboard, tiles, or other finishing materials that may be intended for the finished wall surface. The wall board that lines the outside of the opening can be normal plasterboard and does not need to be non-combustible.
  • Page 42: F7 Fitting The Bevelled Lite Fascia

    Linear Trim GENERAL CONSTRUCTION AND FINISHES SHOWN INDICATIVE ONLY Contact the ESCEA Architectural Advisory Team for assistance with the specification of this fire - aa@escea.com For 10mm-20mm wall linings, an optional “Linear Trim” can be used to cover any unwanted exposed DS Series_Finish_Stopping Bead.dwg...
  • Page 43: F8 Locating Wall Mount Cradle For Wireless Control

    Step 2: Screw and tighten the 4 studs with spacers onto the back of the fascia. Step 3: Rivet the 4 spring clips onto the bracket on top of chassis of the appliance. Step 4: After the 13mm thick wall has been finished, the fascia clips onto the appliance.
  • Page 44: F9 Operating The Appliance

    Ideally 1.2m to 1.5m from the floor The radio frequency signal will go through some walls but for best results Escea suggest that the cradle position is less than 10 metres away from the heater. The best height to locate the cradle off the ground is about chest height.
  • Page 45: F10 Normal Operating Sounds And Smells

    These are all normal operating sounds and should not be considered as defects in your appliance. Fan: Escea gas appliances use electric fans to push heated air into the room. It is not unusual for the fan to make a “whirring” sound when ON. This sound will increase or decrease in volume depending on the speed setting of your fan.
  • Page 46: Installation Checklist

    Installation Checklist Go through the following checklist to ensure you have installed the appliance correctly □ Correctly sized cavity to suit your fascia and flue configuration □ Correct clearances to combustibles □ An electrical isolating switch to the appliance, accessible after finished installation □...
  • Page 47: Service Manual

    • This manual should be left with the appliance. Only use Escea approved spare parts. • • Spare parts are available from an Escea Distributor or Retailer • DO NOT MODIFY THIS APPLIANCE. Annual service procedure □ Isolate power and gas supply to fire.
  • Page 48: S2 Error Codes

    Error Codes This gas fire has been designed to show error codes to help explain and identify any fault situation that occurs. These codes will appear on the wireless remote control in the form of a large letter “E” with a number beside it.
  • Page 49 The bimetallic snap disk mounted on the exhaust collector box has tripped. • Check that fascia panels are installed correctly as incorrect installation may result in restricted air flow. • Check that fans are plugged in, cleaned, and free turning - room air fans Appliance Over may be slowed or stalled.
  • Page 50: S3 Cleaning The Fuel Bed And Glass

    Check that the exhaust fan is operating and cowl is not blocked in any way. Cleaning the Fascia The outside of an Escea Fascia must only be cleaned with a soft microfibre cloth. If heavier cleaning is required for the likes of grease or stubborn fingerprint removal we recommend the use of a dedicated stainless steel cleaner for stainless steel fascias or warm soapy water for powder coated fascias.
  • Page 51: S7 Replacing The Burners

    1. Ensure the fire and remote are set to “OFF” (only the time is displayed on the remote). 2. While the remote is in its “OFF” mode with only the time showing on the display, press the MINUS, PLUS, and FAN BOOST buttons simultaneously (as shown to the right) until the characters “03”...
  • Page 52: S10 Removing The Control Tray

    ISOLATE THE POWER TO THE FIRE BEFORE STARTING THIS PROCEDURE. Screw Locations: S10 Removing the Control Tray ISOLATE THE POWER TO THE FIRE BEFORE THIS PROCEDURE. Refer to Step 1 of Section E6 S11 Pressure Switch Removal 1. With the infill removed, remove the 3 screws in the reflective panel (shown shaded in the diagram below).
  • Page 53 2. Remove the 10 screws (shown in the diagram below) in the access hatch and carefully remove from the firebox. 3. Remove the 2 silicone tubes (making note of which tube goes on each spigot). Disconnect the two wires from the pressure switch and remove the two screws on either side of the pressure switch to remove it from the bracket.
  • Page 54: S12 Replacing The Thermal Cut Out (Tco)

    S12 Replacing the Thermal Cut Out (TCO) WARNING - Ensure power is turned off before removing any TCO. There are two thermal cutouts: one in the LH room fan assembly (60°C) and the other attached to the exhaust manifold (140°C). Exhaust TCO (140°C) Access to this TCO by following steps 1 and 2 from section S11.
  • Page 55: S13 Servicing The Horizontal/Universal Vertical Powerflue

    S13 Servicing the Horizontal/Universal Vertical Powerflue Ensure the power to the powerflue is off by disconnecting the power to the appliance inside. If the appliance has been running, allow the powerflue to cool before attempting to service it. Servicing a Horizontal Powerflue: If the powerflue needs servicing, the fan can be accessed from the outside of the installation for horizontal termination and accessed from within the roof space for vertical termination.
  • Page 56: S14 Wiring Diagram

    S14 Wiring Diagram 630503_6...
  • Page 57 630503_6...

Table of Contents