3.4.1 Securing the Transducers (cont.)
2. Once all the studs are inserted and hand-tightened, the studs must be torqued to 80 ft-lb (108 N-m) in three stages.
Set the torque wrench to 30 ft-lb (40 N-m) and torque the studs in the order shown below.
3. Set the torque wrench to 60 ft-lb (81 N-m) and torque in the order shown below.
4. Set the torque wrench to 80 ft-lb (108 N-m) and tighten in the order shown above.
5. Repeat steps 1 through 4 for the other nozzle.