9
Follow-up Operations
LIE APP
1. Reinstall caps and waterproof connectors on all unused ports of the modules.
2. Ensure that the paint on the module exterior is intact. If paint has flaked off, repaint the area to avoid corrosion.
3. Clean the site and leave.
FAQ:How Do I Expand the Capacity of DC Loads?
LIE APP
DC load
Four-way connector
9
Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
e.huawei.com