Download Print this page

Install Cables; Power On The Device - Huawei PI-DC A11 Product Overview And Installation Manual

Optix rtn

Advertisement

Installation Guide

Install cables

Install the P&E cable of the PI.
Install the power cable of the PI.
Black: 0 V power cable
(connected to the positive
terminal of the power supply
device)
Blue: -48 V power cable (connected to the
negative terminal of the power supply device)
Install an outdoor fiber on the PI.
Connect the GE electrical port to a
piece of user-side equipment.
30/31 >>
Connect to the P&E port on the device.
NodeB
Connect the RJ45 connector
to the GE port of the PI.
Arrange indoor PI cables.

Power on the device

1
Turn the power output switch on the rear of the PI to the FORCE side.
2
Switch on the power supply device connected to the PI.
3
Check the system indicator on the device.
Device
NOTE
If two or three PIs are installed on one auxiliary installation
bracket, cables of the PIs should be arranged to meet the
requirements of the site. Generally, power cables are routed
along the left side in the cabinet and service cables are routed
along the right side in the cabinet.
NOTE
In normal conditions, you must first
select the power supply mode and
then power on. If you need to change
the power supply mode after power-on,
you need to restart the PI.
NOTE
In normal conditions, DC IN and P&E OUT indicators are on
(green). For a description of indicator states, see the Product
Description.
NOTE
In normal conditions, the system indicator is on (green).
08

Advertisement

loading