English (GB) Installation and operating instructions Original installation and operating instructions This appliance can be used by children These installation and operating instructions aged from 8 years and above and persons describe UPS, UPSD Series 200. with reduced physical, sensory or mental Sections 1-6 give the information necessary to be capabilities or lack of experience and able to unpack, install and start up the product in a...
See section 6.4.1 Nameplate. 2.2 Scope of delivery The box contains the following items: • UPS Series 200 pump • installation and operating instructions in four languages Fig. 1 Horizontal motor shaft •...
3.3 Terminal box positions Possible flow directions for twin-head pumps. At the bottom close to the pump housing, the stator housing has two drain holes, 5 x 10 mm, to enable condensed water to escape. The drain holes must point downwards. See the arrows in fig. 2. Do not consider the air vent holes in the stator housing as drain holes.
3.5 Electrical connections 3.7 Twin-head pumps with relay module The electrical connection must be carried out The pump is connected directly to the mains as it according to local regulations. incorporates overload protection at all three speeds. The pumps are factory-set to alternating operation DANGER as duty and standby pump.
Pumps fitted with protection or relay module must not be connected to a frequency converter. Observe local regulations setting limits for We recommend that you use Grundfos MAGNA and manual lifting or handling. UPE Series 2000 which have built-in frequency converter.
UPS, UPS D multispeed circulator pumps can run at performance will be reduced. three different speeds. Consult Grundfos Product Center on The pumps are available as single-head or twin-head www.grundfos.com for further details. pumps. All pumps incorporate a thermal switch in the stator.
7. Control functions 6.4 Identification 6.4.1 Nameplate 7.1 Single-head and twin-head pumps with standard module DK-8850 Bjerringbro Denmark D32-120 F L= 220mm P/N:96401841 Model:C PC 1239 Made in Serbia 1x230 240V 50Hz 1.55 1.65 IPX4D 1.75 Max 1.0 MPa TF 120 Fig.
7.2 Twin-head pumps with relay module All pumps with relay module incorporate a green and a red indicator light. The function of the two indicator The two terminal boxes are connected via a four- lights and the signal output is shown in the following core cable.
7.3 Speed selection Change the pump performance as follows: 1. Switch off the power supply to the pump with the external mains switch. The green indicator light in This section does not apply to pump the terminal box must be off. version for Korea.
8. Fault finding the product This section consists of two subsections, i.e. for pumps with terminal box with standard module and for twin- head pumps with terminal box with relay module. WARNING DANGER Pressurised system Electric shock Death or serious personal injury Death or serious personal injury Before dismantling the pump, drain the It must be possible to lock the main switch...
8.2 Twin-head pumps with relay module Fault Cause Remedy The pump does not One fuse in the installation is Replace the fuse. run. None of the blown. indicator lights are The external mains switch Switch on the mains switch. switched off. The current-/voltage- Repair insulation defects, and cut in the circuit operated earth-leakage...
9. Technical data System pressure The flange pressure number (PN) is indicated on the Supply voltage pump flanges. The table below shows the maximum permissible system pressure for the various pressure Single-phase Three-phase numbers at different temperatures: pumps pumps Bronze 1 x 230-240 V 3 x 400-415 V Cast-iron pumps...
To provide overload protection, connect the switch to an external thermal switch or fit a Grundfos protection or relay module. See figures and 2. If the pump is protected via an overload relay, i.e.
Page 15
Appendix T1 T2 Stop Start 3~ 230 V (Norway) 3~ 400-415 V (Europe) 3~ 200-230 V (Japan) Stop Stop Start Start Fig. 1...
Page 16
T1 T2 Stop/Start 3~ 400-415 V (Europe) 3~ 230 V (Norway) 3~ 200-230 V (Japan) Stop/Start Stop/Start Fig. 2...
Page 23
50 Hz Minimum inlet pressure for hot water Liquid temperature Pump type 75 °C 90 °C 120 °C UPS/UPSD [bar] [MPa] [bar] [MPa] [bar] [MPa] 32-60 0.05 0.005 0.02 0.15 32-120 0.04 0.07 1.95 0.195 40-60/2 0.15 0.015 0.45 0.045 1.75 0.175 40-120...
Page 24
Flange forces and moments For maximum permissible forces and moments from the pipe connections acting on the pump flanges or thread connections, see fig. 10. Fig. 10 Flange forces and moments Force Moment [Nm] ΣFb ΣMb Diameter, DN 1300 1025 1050 1650 1100...
Page 26
Argentina China Hong Kong Bombas GRUNDFOS de Argentina S.A. GRUNDFOS Pumps (Shanghai) Co. Ltd. GRUNDFOS Pumps (Hong Kong) Ltd. Ruta Panamericana km. 37.500 Centro 10F The Hub, No. 33 Suhong Road Unit 1, Ground floor Industrial Garin Minhang District Siu Wai Industrial Centre 1619 Garín Pcia.
Page 27
Malaysia Serbia Turkey GRUNDFOS Pumps Sdn. Bhd. Grundfos Srbija d.o.o. GRUNDFOS POMPA San. ve Tic. Ltd. 7 Jalan Peguam U1/25 Omladinskih brigada 90b Sti. Glenmarie Industrial Park 11070 Novi Beograd Gebze Organize Sanayi Bölgesi 40150 Shah Alam Phone: +381 11 2258 740...
Need help?
Do you have a question about the UPS Series and is the answer not in the manual?
Questions and answers