Agm60; Electrical Connection Of Flame Detectors - Siemens LMV36.520A1 Basic Documentation

Basic unit with integrated fuel-air ratio control for forced draft burners
Table of Contents

Advertisement

18/248
Building Technologies Division
Infrastructure & Citiies Sector
1.4.2

AGM60...

Mains voltage
Mains voltage
Figure 4: AGM60... electrical connection
When installing the unit, make certain that non-insulated parts in the mounting frame do
not get into contact with the connection terminals. Also observe the lateral connecting
area:
Bild 263e/0309
Figure 5: AGM60... lateral connecting area
1.5

Electrical connection of flame detectors

It is important to achieve practically disturbance- and loss-free signal transmission:
Never run the detector cables together with other cables
– Line capacitance reduces the magnitude of the flame signal
– Use a separate cable
Observe the permissible detector cable lengths
The mains-powered ionization probe is not protected against electric shock hazard.
It must be protected against accidental contact
Earth the burner in compliance with the relevant regulations; earthing the boiler
alone does not suffice
Locate the ignition electrode and the ionization probe such that the ignition spark
cannot arc over to the ionization probe (risk of electrical overloads)
Basic documentation LMV36...
1 Safety notes
FELV
Lateral connecting area
CC1P7544en
25.09.2013