Husqvarna BE 20 Operator's Manual page 11

Table of Contents

Advertisement

Always use a filter when you fill fuel.
To make the bottom edge of the
product straight
1. When the product is assembled, put the ends on
trestles to free the bottom edge of the product.
2. Attach a string along the bottom edge of the product.
3. Apply tension to the string to make it straight.
4. If it is necessary, turn the hex screws at the end of
the beam (A). Maximum torque is 100 Nm.
A
CAUTION: Do not adjust the female hex
screws at the other end of the beam.
5. Look at the contact surface between the product and
the trestles to make sure that the product is not
twisted.
6. Look at the bottom edge of the product and the
string to make sure that the product is straight.
To change the direction of rotation
You get the best results if the shaft rotates in the
opposite direction of the operation direction. The tension
in the traction cords is kept and it is easier to control the
movement of the product.
For BE 20: Change the position of the phase switch
in the electrical connector to change the direction of
rotation.
For BE 30: Lift and turn the product around to
change the direction of rotation.
To start the electric drive unit (BE 20)
1. Make sure that the frequency and voltage shown on
the rating plate is the same as the power supply
voltage.
2. Connect a power cord between the electrical
connection of the drive unit and the power supply.
3. Turn the start/stop switch to start the drive unit.
4. Examine the direction of rotation of the vibration
shaft. If the direction is incorrect, move the phase
switch on the electrical connector to change to the
opposite direction.
1299 - 001 - 14.04.2020
To start the fuel drive unit (BE 30)
1. Open the fuel valve.
2. Set the choke control in the correct position.
a) If the engine is cold, close the choke.
b) If the engine is warm or the ambient temperature
is high, open the choke.
3. Make sure that the throttle control is set to idle
speed.
4. Set the engine ON/OFF switch to ON.
5. Pull the starter rope handle until the engine starts.
6. If the choke is closed, open the choke immediately.
7. Let the engine operate at idle speed for 2–3 minutes
and then increase to full speed.
Depth of the vibrations
The depth of the vibrations is related to the consistency
of the concrete. To get the maximum depth of the
vibrations, it is also necessary that the rails are stable.
Usually, the vibrations go to a depth of 10–15 cm/4–6 in.
If the depth of the concrete is more than this, it is
necessary to use other concrete vibration methods
before you use this product.
To operate the product
2 operators, 1 at each end of the product, are necessary
to operate the product safely and correctly. The work
area must be sufficiently large to pull the product from a
distance without stops.
Before operation, install traction cords to the ends of
the product.
Pull and control the product with the traction cords.
a) Use the full length of the traction cords.
b) Keep the traction cords approximately at waist
level, to make sure that the front of the product
does not lift. Do not let the angle (A) of the
product increase to more than 8°.
A
c) Move the product forward (B) at a speed of 0.5–
1.0 m/min. or 1.6–3.2 ft/min.
CAUTION: Do not stop during operation
as this causes marks in the concrete
surface.
B
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be 30Bd 32Bd 42Bd 52Bd 62

Table of Contents