Set up Bluehill Universal
•
Fully integrated testing systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
•
Non-integrated testing systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Fully integrated testing systems
This section describes the following systems:
•
6800
•
3400
•
5900
•
3300
•
5500 and 5500A
•
8800 and ElectroPuls using the 8800MT controller
The following tables list the connections, requirements and configuration details for
each testing system operating with Bluehill
Connections
Software requirements
Recognition and configuration in
®
Bluehill
software
Compatibility with DIC Replay
Connections
Product Support:
www.instron.com
Table 9.
3400 and 6800 systems
Axial and transverse signals via Encoder connector.
3400 requires Bluehill Universal
6800 requires Bluehill Universal
Video extensometer recognition. No configuration required in
Admin
tab.
Available option.
Table 10.
5900 systems
Axial and transverse signals via Strain 1 connector to encoder.
Chapter 6
®
®
.
®
V4.11 or later.
®
V4.18 or later.
software
59
Need help?
Do you have a question about the AVE2 and is the answer not in the manual?
Questions and answers