12 - HANDLING AND TRANSPORT

Before its shipment, the machine is carefully packed in a carton box or in a wooden frame. During the shipment
and storing of the machine, pay particular attention to the upside indication on the packaging. Upon receipt, please
check that the packing is intact and store the machine in a dry place.

13 - MACHINE UNPACKING AND INSTALLATION

ATTENTION: The unit must be installed, opened and repaired by fully qualified technicians only.
If the unit has been damaged externally during transport, may have suffered internal damage to its
components. Check the integrity of the machine before installation.
UNPACKING:
Find the most suitable place where to put the machine, then remove the packaging. Make sure that the machine
has not been damaged during the transport and the storage.
The packaging material does not require any special precautions for its disposal, for it is not dangerous or polluting
at all. Please refer to the local regulations for its disposal.
INSTALLATION:
The machine does not need to be anchored to the floor, except for istallation on self-moving means, where it is
necessary to use the holes on the base for the right fixing.
For a correct use and operation, as well as for an easy maintenance, leave a free space around the
machine
Do not install the machine in dangerous and/or inflammable places and/or unsuitable places.
Do not install the equipment on a inclined pavement or on unstable supports interposed between the
machine and the floor, danger of overturning.
Do not step on and not to use the equipment and its work plans as a ladder to reach the high points, and
generally do not use it as a support tool. Risk of damage and injury.
ELECTRICAL WIRING:
The electrical wiring must be carried out as indicated in the drawing. Check that the supply voltage and the
frequency correspond to those indicated on the rating plate.
The dimensions of the supply cable must suit the machine absorption and
comply to the current regulations.
For connect the equipment to the line the cable must be fitted with a suitable
industrial type plug.
It is advisable to wrap around the cable with some straps and hold the skein
adjacent to the machine during all phases of installation and maintenance (see
figure), so be sure the equipment is physically disconnected from the power
line and that no one can accidentally reconnecting it.
Cut the straps and connect the line only after finishing all installation or maintenance operation, the
equipment must have mounted all the protection panels
It is advisable to install a switch with fuses or a magnetothermal one.
Put the cable in the cable passage hole, then tighten. Connect the cable to the terminals of
the feeder line on the control panel, as shown on the drawing of the present manual.
Check the rotation direction of the motors; if not correct, invert two of the three input phases with each other.
After all the connections to make sure that the power cables are properly secured and protected from
shocks and from contact with hot and/or sharp surfaces.