Bosch Worcester 14/19CBI Installation And Servicing Instructions page 27

Wall mounted boilers for central heating and indirect supply of domestic hot water
Hide thumbs Also See for Worcester 14/19CBI:
Table of Contents

Advertisement

Fig. 34 . Inner Casing - Gas and Electric
Controls. 9/14CBi shown.
16
15
11
14
13
12
11
14
10
8
9
8
Fig. 35 . Base/Control Board Assembly
3
10
1
4
17
18
7
7
25
24
6
5
19
20
6
2
7
9
8
27
21
22
23
1
2
1. Inner casing
2. J bolts and wing nuts (2)
3
3. Combustion chamber cover
4. Burner assembly
5. Inner case cover fixing
points (4)
6. Base/control fixing point
7. Gas valve
8. Burner manifold fixing
screws (4 + 4)
9. Burner manifold
10. Drain point (top flow return)
11. Flow and return pipe fixing clip
4
12. Access panel
13. Temperature sensor
14. Overheat thermostat
15. Casing support
5
16. Return pipe
17. Flow pipe
18. Air pressure switch
19. Combustion test point
20. Air pressure switch fixing clip (4)
21. Flue hood
22. Fan
23. Sensing tubes
24. Outer case earth tag
25. Side cover plate
1. Base/control assembly
2. Base/control assembly fixing
point
3. Gas valve
4. Inner connections earth tag
5. External controls earth post
points (4)
6. Cable clamp
7. External controls connection
8. Control knob
9. Fuse
10. Outer case earth tag
NOTE: Control board cover not shown.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

19/24cbiWorcester 9/14cbiWorcester 19/24cbi

Table of Contents