Installation and Setup
To use the cable management system:
1. Gather the power cables and route the cables along the top arm of the three-
arm assembly, going from number 1 to number 2, as shown in Figure 2-10.
Notes: Make sure you connect all three fasteners on the arm and place the
cables below the arms. See Figure 2-11.
Make sure the cables have sufficient slack between the array back
panel and the first connection to the cable management system,
represented in Figure 2-10 by the number 1.
Figure 2-10: PS5500 Array with Cable Management System
Figure 2-11: Attaching the Hook-and-Loop Fasteners
2. Route the cables along the middle arm of the three-arm assembly, going from
number 3 to number 4 in Figure 2-10.
Installing Array Hardware