Donna
April 14, 2025
I bought a machine and the man I purchased it took it apart to close up. He gave me a bag of parts like screws to put it together. By chance do you know what the screws or pins I need?
1 comments:
Mr. Anderson
April 15, 2025
To assemble the Weider Total BodyWorks 5000, you need the following screws, bolts, and pins:
- Three M8 x 50mm Bolts (part 40) - Three M8 Black Zinc Washers (part 54) - Three M8 Black Zinc Nylon Locknuts (part 46) - Additional parts listed in the parts list include: - M10 x 30mm Bolts (part 37) - M8 x 90mm Bolts (part 38) - M10 x 20mm Bolts (part 9) - M8 x 52mm Bolts (part 40) - M10 x 63mm Screws (part 41) - M10 x 175mm Bolt (part 42) - M10 x 80mm Bolt (part 43) - ST4 x 20mm Screws (part 47) - M6 x 38mm Bolts (part 51) - M8 x 85mm Bolts (part 53) - M10 x 45mm Bolt (part 22) - M10 Nylon Locknuts (part 45) - M8 Black Zinc Nylon Locknuts (part 46) - L-Pins (part 17)
These fasteners are used in various steps of the assembly.
Summary of Contents for Weider Total BodyWorks 5000
Page 1
Model No. WEBE14410 Serial No. Write the serial number in the space above for future reference. Serial Number Decal QUESTIONS? If you have questions, or if there are missing or damaged parts, we will guarantee you complete satisfaction through direct assis- tance from our factory.
BEFORE YOU BEGIN Thank you for selecting the WEIDER WORKS 5000 weight training system. The versatile TOTAL BODY WORKS 5000 is designed to help you develop every major muscle group of the body. Whether your goal is a shapely figure, dramatic mus-...
ASSEMBLY 1. Attach the Stabilizer (6) to the Adjustment Leg (5) with three M8 x 50mm Bolts (40), three M8 Black Zinc Washers (54), and three M8 Black Zinc Nylon Locknuts (46). 2. Slide a Foam Pad (16) onto each side of the Handlebar (29).
ADJUSTING THE RESISTANCE To increase the resistance of the weight training sys- tem, pull a Bungee Cord (35) down and slide it into the Bungee Bracket (10). For more resistance, slide more Bungee Cords into the Bungee Bracket. ADJUSTING THE INCLINE The incline of the weight training system can be adjust- ed to change the resistance level of your workout.
PART LIST—Model No. WEBE14410 Key No. Qty. Description Top Frame Bottom Frame Backrest Frame Backrest Adjustment Leg Stabilizer Support Leg Foot Plate M10 x 20mm Bolt Bungee Bracket Backrest Bracket 50mm Outer Cap 50mm Inner Cap 25mm Round Inner Cap Handgrip Foam Pad L-Pin...
4. The KEY NUMBER and DESCRIPTION of the desired part(s) (see pages 6 and 7 of this manual) WEIDER is a registered trademark of ICON Health & Fitness, Inc. ICON Health & Fitness, Inc. (ICON), warrants this product to be free from defects in workmanship and material, under normal use and service conditions, for a period of ninety (90) days from the date of pur- chase.
Need help?
Do you have a question about the Total BodyWorks 5000 and is the answer not in the manual?
Questions and answers
I bought a machine and the man I purchased it took it apart to close up. He gave me a bag of parts like screws to put it together. By chance do you know what the screws or pins I need?
To assemble the Weider Total BodyWorks 5000, you need the following screws, bolts, and pins:
- Three M8 x 50mm Bolts (part 40)
- Three M8 Black Zinc Washers (part 54)
- Three M8 Black Zinc Nylon Locknuts (part 46)
- Additional parts listed in the parts list include:
- M10 x 30mm Bolts (part 37)
- M8 x 90mm Bolts (part 38)
- M10 x 20mm Bolts (part 9)
- M8 x 52mm Bolts (part 40)
- M10 x 63mm Screws (part 41)
- M10 x 175mm Bolt (part 42)
- M10 x 80mm Bolt (part 43)
- ST4 x 20mm Screws (part 47)
- M6 x 38mm Bolts (part 51)
- M8 x 85mm Bolts (part 53)
- M10 x 45mm Bolt (part 22)
- M10 Nylon Locknuts (part 45)
- M8 Black Zinc Nylon Locknuts (part 46)
- L-Pins (part 17)
These fasteners are used in various steps of the assembly.