Four-Way Valve And Check Valve Replacement Procedure - Mitsubishi Electric PUHY-M200YNW-A1 Service Handbook

Table of Contents

Advertisement

[8-13 Parts Replacement Instructions ]
8-13-3

Four-way Valve and Check Valve Replacement Procedure

1. S, L-module (four-way valve (21S4a))
Explained below is the procedure for replacing four-way valve (21S4a) (on the right when seen from the front of the unit).
Secure sufficient work space before starting maintenance work. (See 8-13-1 Ensuring Maintenance Space (Preparation for the
Maintenance of Refrigerant Circuit Parts).)
(1) Remove the top compressor cover by unscrewing the three screws. (See Figure 1.)
Remove the compressor cover by unhooking the hooks on the back.
(2) Remove the front compressor cover by unscrewing the four screws. (See Figure 2.)
(3) Cut the two cable ties holding TH4 and TH15, and remove the wiring from the rubber bush on the left compressor cover.
(See Figure 3.)
(4) Remove the left compressor cover by unscrewing the two screws. (See Figure 4.)
Compressor cover (top)
Figure 1
Figure 4
(5) Remove the plastic cover and the coil holding solenoid valves 2, 9, and 10 (SV2, 9, and10). Remove the thermal insulation
shown in Figure 5. (See Figure 5.)
Solenoid valve coils 2, 9, and 10
(SV2, 9, and10) and coil cover
Enlarged view
Figure 5
(6) Cut the cable tie on the rubber
spacer to remove it. (See Figure 6.)
BS_08_E
Compressor cover (front)
Figure 2
Figure 6
TH4
Rubber bush
TH15
Compressor cover (left)
Figure 3
Cut the cable tie here.
Thermal insulation (180 mm x 70 mm x 10 mm thick)
*Included with the four-way valve replacement parts
Use the insulation material included with the four-way
valve.
Cut the cable tie here.
Rubber spacer and cable tie
Compressor
cable tie
79