Download Print this page
Mercia Garden Products 03HEL1008DDFW-V3 General Instructions Manual

Mercia Garden Products 03HEL1008DDFW-V3 General Instructions Manual

10x8 helios summerhouse
Hide thumbs Also See for 03HEL1008DDFW-V3:

Advertisement

Quick Links

General Instructions
03HEL1008DDFW-V3
10x8 Helios Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03HEL1008DDFW-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03HEL1008DDFW-V3

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 03HEL1008DDFW-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 3032mm Depth = 2928mm Height = 2141mm Base Dimensions: Door Handle QTY2 Mortice Lock Key Plate Hinge QTY 6 Width = 2918mm PI-07-0001 PI-07-0017 PI-07-0023 Depth = 2387mm...
  • Page 3 Please retain product label and instructions for future reference Step 2 Continued... Step 2 Door Fixings Join the ush hinges (No. 25) to the Fix the door bar (No. 20) to the door frames (No. 7 & 8) using 30mm inside of the slave door using screws.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Place the back panel’s (No.4) and the Following the same method outlined right gable (No. 2) onto the oor. in step 3, place the assembled door panel onto the oor inbetween the Fix the two panels together gables.
  • Page 5 Please retain product label and instructions for future reference Step 6 Step 7 Place the rst ridge bar Place the rst roof panel (No. 6) onto (No.9) inside the building the supports (making sure the roof and line up with the upright framing sits behind the support bar) framing on each gable.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 8 Step 10 Cut the felt into 4x strips and lay onto Position the roof ends (No. 13) onto the roof in the order shown in the the roof, ensuring the tongue and illustration, leaving approximately 50mm groove align and the boards sit...
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 12 Fix the fascia’s (No. 17) to the front Fix the turn button’s (No. 26) to the top and bottom of the slave door using 2x 30mm black screws. of the building using 4x40mm screws.
  • Page 8: After Treatment

    Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...