Installation; Downtime After Installation; Levelling The Dryer - Miele PDR 507 HP Operating And Installation Instructions

Heat-pump tumble dryer
Table of Contents

Advertisement

Installation

Installation
Ensure that no lockable door, sliding
door or a door hinged in the opposite
direction is installed in the pivoting
range of the dryer door.

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.

Levelling the dryer

The appliance must stand perfectly
level on all four feet to ensure safe and
proper operation.
76
The screw feet can be adjusted to
compensate for unevenness in the floor.
This tumble dryer is not suitable for
building under.
Never block the ventilation slots on
the tumble dryer. Do not block the
gap between the bottom of the
tumble dryer and the floor with plinth
boards, deep pile carpet etc. which
could obstruct the openings. This
would hinder a sufficient flow of air
to the tumble dryer.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents