Chapter 2: Construction of power optimizers
Step 2, Connecting a module to an optimizer
power
Connect the output connector Plus (+) of the module to the input connector Plus (+) of the power optimizer.
Connect the output connector Minus (-) of the module to the input connector Minus (-) of the power
optimizer.
Mounting Bracket
NOTE :
Images are for illustrative purposes only. Refer to the label on the product to identify the input over and under and output connectors.
Step 3, Connecting Power Optimizers
channels
You can build strings in parallel of unequal length, that the number of power optimizers on each channel may be
different. maximum and minimum chain lengths are shown in the data sheet of power optimizers. Refer to the
SolarEdge site designer for verification of the chain length.
NOTE :
The string length must not exceed 300m from the CC + to CC UPS. Use DC cables of 4 mm² minimum.
1 Connect the output connector Minus (-) of the first channel power optimizer
1 Connect the output connector Minus (-) of the first channel power optimizer
output connector Plus (+) of the second chain power optimizer.
SolarEdge Installation Guide - MAN-01-00060-2.6
+
Exit
-
Figure 1: Connectors of the power optimizer
+
Input - Connect the module
-
13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SE3500 and is the answer not in the manual?

Questions and answers

Table of Contents