Verifying The Installation - Huawei SUN2000 Series Quick Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

Connecting RS485 communications cables (4–8 mm two-hole or three-hole rubber plug)
Three communications
cables
5

Verifying the Installation

No.
Acceptance Criteria
1
The solar inverter is installed correctly and securely.
2
The DC switches and downstream AC switch are set to OFF.
3
All cables are connected correctly and securely.
4
Unused terminals and ports are locked by watertight caps.
5
The installation space is proper, and the installation environment is clean and tidy.
6
The maintenance compartment door is closed and secured.
One or two
communications cables
One communications cable
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-110ktlSun2000-100ktlSun2000-125ktl

Table of Contents