Download Print this page

NorthStar LITE Applications Manual page 10

Advertisement

Batteries can leak electrolytes if mishandled.
Electrolytes in contact with skin or eyes
can cause injury. In the event of an
electrolyte-induced injury, rinse the affected
area with water and immediately seek
medical attention. Use protective equipment
when replacing batteries.
Always use these installation instructions.
How to connect RS485 (single unit to upper host and
parallel units to upper host) and RS232 to PC
Parallel connection DIP switch description
Interface description (power connections and dry
contact alarms)
Torques to be used during assembly:
Dimension
Torque
M4
2 Nm
M6
6 Nm
M8
8 Nm
Cables:
The allowed cable dimensions are:
2
Min. 35mm
2
Max. 50mm
(recommended)
In order to determine proper dimensioning of the power
cables, consideration must be made in regards to type and
length of cable, charging settings, environmental
conditions, physical installation etc.
Installation:
Do as follows to install the battery unit in a standard 19"
rack:
1
Make sure
the CB is
turned off
before
starting the
installation
of the
batteries
Warning!
Note
Mounting brackets
Grounding points, cage nuts
Battery cables
Circuit breaker
2
Mount the
brackets
with 6 M4
screws on
each side of
the battery
unit.
3
Prepare the
19" rack
with cage
nuts. See
picture for
hole pattern
on the
battery unit.
4
NOTE: The battery unit is heavy and will need extra support
in the 19" rack.
5
Lift the
battery unit
in place and
fasten it
with 4 pcs
of M6
screws (2 on
each side).
6
Tighten the
screws.See
table above
for torques.
10

Advertisement

loading