In order to satisfy plumbing regulations, a backflow preventer or check valve maybe required. Failure to use an appropriate anti-flood device for any reason will not obligate or make Crystal Mountain responsible in any way for Product Liability issues relating to any claims, including water damage claims.
Page 2
2) Use latex or nitrile gloves or wash hands before and after handling water contact parts. Remove cover assembly from the reservoir by pulling upwards (Figure 4-5 and Figure 4-6). Rinse cover assembly and reservoir with clean water and reassemble prior to installation into the frame assembly (Figure 4-7 and Figure 4-8).
Page 3
Figure 4-17 Figure 4-18 3. Install POU system into cooler: a. Connect the bottle tube (within cooler) to the top of the POU system (Figure 4-19 to 4-21). Figure 4-19 Figure 4-20 Figure 4-21 b . Verify Indicator Position Ensure that float indicator is in the GREEN position after installation is complete (Figure 4-22).
Page 4
c. Position POU system within the cooler, ensuring that the tubing is not kinked or located where it will interfere with the access door (Figure 4-23). Figure 4-23 d. Push downwards to close the access door (Figure 4-24) Figure 4-24 4.
Need help?
Do you have a question about the STORM Bottom-Load and is the answer not in the manual?
Questions and answers