Appearance

Function module: PC500-300H1,
PC500-300G1
Lithium battery: CBM20E-N14A1
Function
Module
Color
Status
Meaning
Indicator
The function module has no power input
Off
or is faulty.
Blinking
The function module is communicating
Run
slowly
properly with upstream monitoring
Green
indicator
(0.5 Hz)
equipment.
Blinking
The function module fails to
fast (4
communicate with upstream monitoring
Hz)
equipment.
Off
There is no alarm.
Blinking
The function module has generated an
Alarm
slowly
alarm, which can be cleared.
Yellow
indicator
The function module has generated an
Steady
AC power failure or PV array fault alarm,
on
which can be cleared.
Off
The function module is normal.
Blinking
The function module has an external
Fault
Red
slowly
fault, which can be cleared.
indicator
Steady
The function module has an internal fault,
on
which cannot be cleared.

Grid Hybrid Scenario

Lightning rod
PMP
microwave
Cantilever
Bullet
cameras
Pole
mounting kit
Lithium battery
Pole
mounting kit
Function
Lithium battery
module
Pole
1
Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved.

Solar Hybrid Scenario

Lightning rod
Dome
camera
PMP
microwave
Pole
mounting kit
Pole
mounting kit
Function
module
Lithium
Battery
Color Status
Indicator
Off
Steady on The lithium battery is powered on.
Run
Blinking
Green
slowly
indicator
(0.5 Hz)
(RUN)
Blinking
fast (4 Hz)
Off
Alarm
Steady on
Red
indicator
Blinking
(ALM)
slowly
(0.5 Hz)
NOTE
The three indicators are steady on when the power unit of the
function module is upgrading. They return to normal status after the
upgrade is complete.
PV modules
PV module
support
Cantilever
Dome camera
Bullet
cameras
Lithium battery
Lithium battery
Pole
Meaning
The lithium battery has no power input
or is faulty.
The lithium battery is communicating
properly with upstream monitoring
equipment.
The lithium battery fails to
communicate with upstream
monitoring equipment.
There is no alarm.
The lithium battery has generated a
fault alarm and needs to be replaced.
The lithium battery has generated a
protection alarm, which can be cleared.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei PowerCube 500 PC500-300H1

  • Page 1 PowerCube 500 V200R001C10 Quick Guide (PC500-300H1, PC500-300G1) Issue: 03 Date: 2018-03-22 Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved. Overview Appearance Grid Hybrid Scenario Solar Hybrid Scenario Function module: PC500-300H1, PC500-300G1 Lightning rod Lightning rod microwave Cantilever PV modules...
  • Page 2 Tools Routing Cables Through the Pole 1. Place the pole on a wooden case or a similar object. 2. Route a pull wire. 3. Route cables. Routing Cables Through PMP microwave cables the Grid Hybrid Pole Mains AC cable, module ground cable, optical fiber, camera cable, Mains AC cable Module...
  • Page 3 Installing a Cantilever Installing Cameras and Cables Installing Cameras For the camera installation method, see the camera document. Installing Camera Cables For the cable connections at the camera side, see the camera document. Reserve the other ends of cables. (Optional) Installing the PMP Microwave For the PMP microwave installation method, see the PMP microwave product document.
  • Page 4 6. Install horizontal beams. 7. Install two PV modules. NOTE  Keep the slots of horizontal beams facing inwards for installing PV modules.  Partially tighten the bolts so that PV modules can be adjusted during installation. Spacing shim NOTE Ensure that the junction boxes on the rear of PV modules are positioned consistently.
  • Page 5 Installing an Antenna Fastener and Lightning Rod Grid Hybrid Scenario Solar Hybrid Scenario Adjust the tilt angle of the lightning rod based on the site latitude. Site Lightning Rod Latitude Tilt Angle 0–15° 15° 16–25° 25° 26–30° 35° 31–45° 45° Installing the Function Module and Lithium Battery NOTICE ...
  • Page 6 3. Install the function module 4. Install a function module. 5. Install the lithium battery hanging kit. hanging kit. NOTE The option to install a lithium battery depends on the scenario. No lithium battery is required in the grid-only scenario. 6.
  • Page 7 3. Drill holes and install bolts in the holes. 2. Mark mounting holes. NOTE One wall mounting kit A and one wall mounting kit B are used for each module. Determine the number of wall mounting kits based on the Hammer drill number of modules to be installed.
  • Page 8 10.(Optional) Install the second 9. Install a lithium battery onto the wall. NOTE lithium battery onto the wall. If two lithium batteries are required, install them onto two adjacent wall hanging kits. Installing Cables NOTE Route inter-device cables through the pole. Installing Ground Cables for Modules 10.1 1.
  • Page 9 Installation Procedure 1. Push up the sunshade 2. Open the maintenance 3. Install cables for P&E cameras. until the spring fastener compartment. is stuck gently. NOTE Cables for the dome camera can only be connected to the P&E(++) ports. Dome camera Bullet camera 3 Bullet camera 1 Bullet camera 2...
  • Page 10 9. Close the maintenance compartment door. 8. Install optical fibers. 10.Push down the sunshade until NOTE the spring  Before closing the maintenance compartment fastener is stuck door, check that cables are properly installed. gently.  After closing the door, press the left side of the maintenance compartment door by hand and tighten the screws.
  • Page 11 Preparing AC Input Cables and Connecting Waterproof Connectors Flat-head Scale line screwdriver (Unit: mm) Installing Power Cables and Signal Cables 10.4 NOTICE Ensure that caps and waterproof connectors are installed at all idle ports on the modules. Installing an RJ45 Communications Cable for a Lithium Battery Connecting Cables Between the Function Module and Lithium Batteries PV input AC input...
  • Page 12 Installing Cable Covers Installing a Cable Cover for the Function Module 11.1 Install a Cable Cover for the Lithium Battery 11.2 Erecting the Pole Erecting the Mains Pole 1. Check whether the pole needs to be repainted. Repaint the damaged area of 2.
  • Page 13 Erecting the Solar Hybrid Pole 1. Check whether the pole needs to be repainted. Repaint the damaged area of 2. Secure the pole to the foundation. the pole, and then use the crane to hoist the pole to the foundation. Verifying the Installation 1.
  • Page 14 For the PMP microwave commissioning method, see the PMP microwave document. 14.7 Checking Alarms 1. Choose Configuration > Browse Current Alarms from the Function Tree. 2. Check the displayed alarm information. Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...

This manual is also suitable for:

Powercube 500 pc500-300g1

Table of Contents