Installation; Checking Before Installation; Tools - Huawei SUN2000-8KTL-M0 User Manual

Hide thumbs Also See for SUN2000-8KTL-M0:
Table of Contents

Advertisement

SUN2000-(12KTL, 15KTL, 17KTL, 20KTL)-M0
User Manual

4.1 Checking Before Installation

Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter model is not
what you requested, do not unpack the package and contact your supplier as soon as possible.
Package Contents
After unpacking the inverter, check that the contents are intact and complete. If any damage is
found or any component is missing, contact your supplier.

4.2 Tools

Type

Installation

Tools
Issue 03 (2019-07-19)
You are advised to remove the packing materials within 24 hours before installing the inverter.
For details about the number of contents, see the Packing List in the packing case.
Tool
Hammer drill
Drill bit: Φ8
mm and Φ6
mm
Copyright © Huawei Technologies Co., Ltd.
4
Socket wrench
Torque
set
screwdriver
Phillips head:
M3
4 Installation
Installation
Diagonal pliers
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents