Replacing The Emergency Stop Button (Esb) - GE T2100-ST1 Service Manual

Hide thumbs Also See for T2100-ST1:
Table of Contents

Advertisement

Component/FRU Removal and Replacement

Replacing the Emergency Stop Button (ESB)

Tools Required
o
o
o
o
1.
2.
3.
4.
5.
148
1/8" Allen Wrench
¼" Flat Blade Screwdriver
2 Pair Long Nose Pliers
Grounding Wrist Strap
Approximate time to complete: 30 min
Turn the treadmill main power switch to the OFF position.
Unplug the treadmill plug from the wall receptacle.
Allow the treadmill to discharge for 1 minute.
With a 1/8" Allen wrench, remove the (2) 10-32 screws (Fig.
A) holding the ESB assembly to the fabricated handrail.
Fig. A
1/8" Allen
Wrench
Fig. B
Fabricated
Handrail
Screwdriver
With a flat head screwdriver, remove the ESB assembly
from the fabricated handrail (Fig. B).
T2100-ST1 Treadmill, 110V / T2100-ST2 Treadmill, 220V
ESB or STS
Assembly
10-32 Screw
2097937-002 Rev G
11 March 2019

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T2100-st2

Table of Contents