Dalla Corte EVO 2 Installer Manual
Hide thumbs Also See for EVO 2:

Advertisement

INSTALLER MANUAL

CONTENTS

• IDENTIFICATION PLATE

• MACHINE ACCESSORIES

• GENERAL NOTES
• INSTALLATION
• STARTING THE MACHINE
• ADJUSTING MACHINE SETTINGS
• ALARM CONTROL
• WIRING DIAGRAM
The manufacturer reserves the right to modify this manual without updating the previous
editions.
IDENTIFICATION PLATE
MACHINE ACCESSORIES
- set of complete portafilters + 1 complete 2-dose portafilter
- complete set of flexible water connection hoses
- two sets of filters
- set of group showers
- cleaning brush
- box of cleaning tablets
- tamper
- user and maintenance manual
- blind filter
- rubber tamping station
- cloth for the cleaning of external parts.
MANUALE INSTALLATORE RELEASE 00.1
PAG. 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVO 2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Dalla Corte EVO 2

  • Page 1: Identification Plate

    INSTALLER MANUAL CONTENTS • IDENTIFICATION PLATE • MACHINE ACCESSORIES • GENERAL NOTES • INSTALLATION • STARTING THE MACHINE • ADJUSTING MACHINE SETTINGS • ALARM CONTROL • WIRING DIAGRAM The manufacturer reserves the right to modify this manual without updating the previous editions.
  • Page 2: General Notes

    This machine must be destined exclusively to the use it has been conceived for. Any other use shall be considered improper and therefore unreasonable. The manufacturer cannot be held responsible for any damages caused by improper, wrong or unreasonable use. The electric, water, draining systems shall be arranged in a suitable position to allow correct machine installation.
  • Page 3: Electrical Installation

    INSTALLATION The installation shall be performed in compliance with laws in force and following these instructions. A wrong installation can damage persons, animals and things. The manufacturer cannot be held responsible for any damage caused by wrong installation. The machine must not be installed in places where water jets can be used. The machine must be installed only in places where it can be used and maintained by skilled professionals.
  • Page 4: Water Installation

    • Connection of electric supply cable to electric system through a certified plug that must be accessible once the machine has been installed and is ready to be used. As concerns the connection of the supply cable to the electric system of the building, each conductor shall be labelled with the same code used for the connection to the machine switch (N= neutral, 1= PHASE-1, 2= PHASE-2, 3= PHASE-3, ground symbol for the green-yellow conductor), so that their order is not changed with subsequent malfunctioning.
  • Page 5 STARTING AND HEATING UP THE MACHINE Follow all the instructions with the help of the controls diagram and description in the “USER AND MAINTENANCE MANUAL”. Start the machine after checking all connections. Turn on the water tap 1-Pic.1 and make sure there are no leaking connections in flexible hoses 2- Pic.1.
  • Page 6 Starting from the main screen, push the button for 2 seconds. The display will show: 1- PASSWORD MENU Push to access this menu. The display will show: buttons to choose the Service password level. Default passwords: User PW: 0000 Service PW: 11111 To enter the password, push until the desired value is...
  • Page 7 Push again to highlight the value, then use choose the desired option and push to confirm it. Push to go back to previous menu. 4- TIMER SET UP This menu allows to enable, disable and program the weekly timer for each unit.
  • Page 8 to change the day to which values shall be copied, then push to confirm. Copy the daily program set to all the other days. Otherwise, enter the day you wish to program differently and follow the above-mentioned steps. If the ON / OFF values of each unit are set on 00:00 on a specific day, the unit will be off throughout that day.
  • Page 9 Push to highlight the set value, then use change it, push again to confirm it and then to go back to previous menu. 5-1-2 Boiler Delta T This value can be changed only after consulting the manufacturer (default setting: 2°C). Push to go back to previous menu.
  • Page 10 Push again to highlight the pre-set value, then use to change it, push again to confirm it and then to go back to previous menu. Push to go back to main menu. 6- MACHINE SET UP Push to access this menu. 6-1 Group number This menu is used to set the number of groups to be managed by electronic control.
  • Page 11 6-4 Continuous pouring This menu is used to enable or disable the continuous pouring button on each group. Push to access this menu. Push again to highlight the pre-set value, then use to change it, push again to confirm it and then go back to previous menu.
  • Page 12 Push to highlight the set value, then use change it, push again to confirm it and then to go back to previous menu. 6-8 Water mixing for tea This menu is used to enable and adjust water mixing with the two hot water buttons.
  • Page 13 7-5 Copy group 1 doses to the other machine groups. Push access this menu. Push to confirm the group of origin, then to choose the group of destination and to confirm duplication. Repeat the operation on the groups you wish to copy group 1 data to. At the end of the operation, push to go back to previous screen.
  • Page 14 8-2 Temperature system of measurement Push to access this menu. Push again to highlight the measure to be changed, then use to change it, then push again to confirm it. At the end of the operation, push to go back to previous screen. S.I.
  • Page 15 8-5 Daylight saving time This menu is used to enable or disable daylight saving time automatically. Push to access this menu. to change the value, then push again to confirm it. At the end of the operation, push to go back to previous screen. 8-6 Customer’s corporate name entering Push to access this menu.
  • Page 16 After enabling the GCS function, it is necessary to specify the type of connecting port that will be used, which depends on the type of grinder in use. 9-2 Grinder type Push to access this menu. Note: With DC ONE grinders, DC1 serial port must be used. To connect a DC II grinder, on the other hand, it is necessary to install a 485-232 port converter (optional).
  • Page 17 Push to highlight the value to be changed. to change the value, then push again to confirm it. At the end of the operation, push to go back to previous screen. Note: 15 secs is the default setting, suitable in 90% of cases. 9-6 Set up of GCS enabled groups.
  • Page 18 11-Menu reset This menu is used to reset partial and total coffee dose counters, etc. from the electronic control memory. Push to access this menu. 11-1 Partial coffee dose counters Push to access this menu. 11-1-1/2/3/4/5 Partial counters Push to access this menu. to highlight YES, then push to confirm the reset.
  • Page 19 11-4 Cleaning cycles counters Push to access this menu. to highlight YES, then push to confirm the reset. Once the reset has been completed, the previous screen will be shown automatically. Once the reset of the desired group has been completed, push to go back to previous screen.
  • Page 20 ALARM CONTROL The electronic system of this espresso machine manages all machine functions and controls their correct execution. In case of anomalies, an alarm is recorded and/or displayed. An alarm can be triggered also by an improper use of the espresso machine. In this case, it will be sufficient to correct the improper use.
  • Page 21 "Steam probe short circuit" This alarm is triggered when MCS probe is out of the range. "Gr.1 probe time-out" This alarm is triggered when group 1 does not reach the temperature of 50°C within 5 minutes of turning on. Push the DEL button on display to delete the alarm. "Gr.1 probe interrupted"...
  • Page 22 "Gr.4 volume control failure”, This alarm is triggered when, during an extraction on group 4, the electronic control does not receive impulses from group 4 flow meter. "Auto-fill time-out", This alarm is triggered when the auto-filling mechanism cannot bring water in the boiler back to its working level within the pre-set time.
  • Page 23 WIRING DIAGRAM LEGEND Group 1 push buttons panel (first on the right) Group 2 push buttons panel Group 3 push buttons panel Group 4 push buttons panel Service push buttons panel RSB- Steam boiler resistance Steam boiler safety thermostat Steam boiler 3-phase relay Machine main switch TRAFO- 24V transformer for electrovalves and electronic control...
  • Page 24 MANUALE INSTALLATORE RELEASE 00.1 PAG. 24...
  • Page 25 MANUALE INSTALLATORE RELEASE 00.1 PAG. 25...
  • Page 26 MANUALE INSTALLATORE RELEASE 00.1 PAG. 26...
  • Page 27 MOTHER-BOARD MANUALE INSTALLATORE RELEASE 00.1 PAG. 27...

Table of Contents

Save PDF