Backhoe Operation - Struck Magnatrac RS1000 Operator / Technical Manual

Hide thumbs Also See for Magnatrac RS1000:
Table of Contents

Advertisement

RS1000 Operator Manual 1.01.19.qxp_Layout 1 4/24/19 12:43 PM Page 73

BACKHOE OPERATION

TERMINOLOGY
BOOM
SWING
BALLAST BOX
STABILITY
Stability is the key to backhoe performance. The fol-
lowing information and illustrations pertaining to stability
should be carefully studied prior to operating the backhoe.
To increase stability for a digging operation, position
the loader bucket flat on the ground. Apply sufficient down
pressure on the bucket to transfer weight from the front of
the tractor to the loader bucket.
IMPORTANT: The loader bucket must be flat on the
ground. ROlling the bucket forward so the cylinders
are extended may cause bucket cylinder or rod dam-
age.
During normal digging, as the bucket penetrates the
ground and is filled, there is a tendency for the rear of the
Tractor to raise off the ground and move toward the
bucket. Properly set, the stabilizers anchor the Tractor
and prevent it from moving toward the bucket. The ability
of the stabilizers to hold depends on the amount of weight
acting on them.
BOOM
DIPPER
BUCKET
STABILIZER
LIFT
(Up-Down)
CROWD
(In-Out)
BUCKET
(Curl In - Curl Out)
73
When lifting a full bucket, there is a tendency for the
front of the tractor to rise. COunterweight in the form of a
ballast box is required to overcome this tendency. The
backhoe should not exert more lift force than the effective
counterweight can balance. Effective counterweight is the
weight of the tractor from the stabilizer pads to the loader.
Set the stabilizers to remove weight from the rear
track wheels. The tracks are to remain touching the
ground as this provides for the widest stabilizer stance
and the lowest center of gravity. Raising the tracks off the
ground will not only reduce stability and digging depth, but
will impair performance and impose unnecessary stress
on the unit.
Stability is particularly important when operating the
backhoe at the extreme swing positions, because the ten-
dency is to lift one stabilizer and transfer the total weight
of the unit to the other stabilizer.
FILLING THE BUCKET
Operate two or more levers at the same time through-
out the filling cycle for smooth action and maximum per-
formance.
Control the bucket attitude throughout the digging
cycle to keep the teeth at the proper angle for best pene-
tration. This will minimize dragging and scraping the
bucket through the ground.
When digging in hard-packed soil, bucket penetration
can be increased by applying down pressure with the boom
while crowding in and curling the bucket. If the crowd action
"stalls," it may be necessary to apply lift occasionally during
the digging cycle to correct the bucket depth.
To obtain a cleaner trench and avoid the buildup of

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Magnatrac RS1000 and is the answer not in the manual?

Questions and answers

Lawris Roach
February 7, 2025

What are the specifications for an original v belt for the Struck RS1000 mini dozer

1 comments:
Mr. Anderson
February 11, 2025

The original V belt for the Struck Magnatrac RS1000 mini dozer is the #4356 Micro-V Belt. It is routed around the #1643/#4355 Lower Power Shaft, passes around the #4346 #1617C tube of the #1617R Right Control Handle #4345 Assembly, and is looped between the #4345 Micro-V Engine Pulley and the body wall. The belt should be properly seated and appear as shown in the manual's reference images.

This answer is automatically generated

Related Products for Struck Magnatrac RS1000

Table of Contents

Save PDF