Installing The Boom - Toro RT600 Operator's Manual

Direct drive trencher
Hide thumbs Also See for RT600:
Table of Contents

Advertisement

75 cm (29-1/2 inches)

Installing the Boom

Assembling and Installing the Boom-End Cylinder
1x
1x
1x
1x
O-ring
Testing the hoses
1. Start the machine; refer to the traction unit Operator's
Manual.
2. Operate the trencher-chain direction control and the
attachment control (located on the right side of the
operator seat) in both directions several times to bleed
the air from the hydraulic motor and the hydraulic lift
cylinder.
Note: The trencher-chain direction control rotates the
hub forward and rearward, and the attachment control
raises and lowers the boom-mount fitting. Have
another person observe the hub and the boom-mount
fitting as they move. Move each of the controls in both
directions until the hub and the boom-mount fitting
move smoothly in both directions.
1x
Washer
(3/16 x 1-3/4
inches)
8
1x
1x

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2520025200e

Table of Contents