Installing The Digging Chain - Toro RT600 Operator's Manual

Direct drive trencher
Hide thumbs Also See for RT600:
Table of Contents

Advertisement

Installing the Wear Pads and Restraint Bar
1x
1x
5x (short boom)
6x (long boom)
Wear pad (short and
(M10)
long shown)
Apply thread-locking adhesive to the bolts (M10) and secure the wear pad onto the boom assembly.
Short boom shown
Torquing the Hardware
Bolts (M10)
Bolts (M12)

Installing the Digging Chain

Refer to
Installing the Digging Chain (page
24).
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2520025200e

Table of Contents