Damage due to incorrect handling! Failure to comply with the following instructions regarding device usage and handling can result in dan- ger to life and limb and/or property damage to the product and other equipment; SOLARWATT assumes no liability for such hazards.
Deutschland GmbH by post after 2 to 3 weeks. After the MyReserve has been commissioned, your installer will hand over the commissioning log to you. This confi rms that all installation conditions have been complied with correctly. Keep the completed commissioning report in a safe place.
For Bluetooth communication MyReserve uses a point-to-point connection. So connecting is only possible between two devices. If you like to use the MyReserve app in your entire home network, your installer has to connect your MyReserve to the PowerDataGateway (PDG), see page 17.
NOTE NOTE After a restart of MyReserve, an initialization with calibration and check of the start conditions takes place (a PV-surplus must be measured once). Unloading will not occur until the following day after MyReserve has detected a minimum surplus of PV energy.
Need help?
Do you have a question about the MYRESERVE and is the answer not in the manual?
Questions and answers