Advertisement

EN
EN
MYRESERVE
USER MANUAL
Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018
Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MYRESERVE and is the answer not in the manual?

Questions and answers

Summary of Contents for solarwatt MYRESERVE

  • Page 1 MYRESERVE USER MANUAL Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 1...
  • Page 2 Page 2 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 3: Table Of Contents

    Troubleshooting ................19 MyReserve critical states ......................... 20 Firefighting measures ........................20 Instructions for firefighting measures ..................21 FAQ ....................22 Disposal ..................23 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 3...
  • Page 4 All modules work in The MyReserve battery storage system rounds out perfect harmony with one another. SOLARWATT’S systemic concept. In choosing the MyRe- Page 4 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 5: General Information

    Authorized professionals with thorough knowledge of all applicable standards, directives and laws • Specialists who have taken part in one of SOLARWATT GmbH’s MyReserve certification courses. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 5...
  • Page 6: Safety Notices

    Damage due to incorrect handling! Failure to comply with the following instructions regarding device usage and handling can result in dan- ger to life and limb and/or property damage to the product and other equipment; SOLARWATT assumes no liability for such hazards.
  • Page 7: Warranty And Fullcoverage All-Risc-Insurance

    Deutschland GmbH by post after 2 to 3 weeks. After the MyReserve has been commissioned, your installer will hand over the commissioning log to you. This confi rms that all installation conditions have been complied with correctly. Keep the completed commissioning report in a safe place.
  • Page 8: Product Description

    Battery connection PV (-) PV string negative terminal PV (+) PV string positive terminal ON/OFF DC isolator STATUS Status LED/ Bluetooth antenna Page 8 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 9: Characteristics Of Myreserve

    5 years. the costs of replacement, transport, installation and re- * FullCoverage insurance is available only in selected countries. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 9...
  • Page 10 2,4 kWh 2.4 kWh 7,2 kWh 7.2 kWh 13 h 4,5 h 12 kWh 12 kWh 13 h 4,5 h 1,5 h Page 10 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 11: Charging Behavior

    100 % Chemical stress dramatically 95 % speeds up the battery‘s aging process. MyReserve conventional battery 50 % 05:00 12:00 18:00 Time Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 11...
  • Page 12: Direct Supply From Pv

    (0.5 kW infeed). This constellation is typical on, for example, sunny after- noons. Page 12 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 13: Direct Supply From Pv And Discharge Battery

    If this five-month time limit is exceeded, the bat- tery modules can be re-activated by a service technician. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 13...
  • Page 14: Myreserve Operation

    A heat development of 60°C can occur on the MyReserve Command. Page 14 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 15: Led Indicators For Status

    LED indicators and what they ging state. See chapter “Troubleshooting” for information mean. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 15...
  • Page 16: Myreserve Monitoring

    For Bluetooth communication MyReserve uses a point-to-point connection. So connecting is only possible between two devices. If you like to use the MyReserve app in your entire home network, your installer has to connect your MyReserve to the PowerDataGateway (PDG), see page 17.
  • Page 17: Via Network Integration With The Myreserve App And The Myreserve Portal

    You can always be sure that your data is kept strictly confi dential. NOTE NOTE NOTE NOTE The MyReserve app cannot be used simultaneously via Bluetooth and network connection. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 17...
  • Page 18: Via Network Integration With The Energymanager

    Energy Management, you can get to know and test the EnergyManager Portal. Ask your SOLARWATT installer! He will set up your Ener- gyManager Portal login. Page 18 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 19: Troubleshooting

    NOTE NOTE After a restart of MyReserve, an initialization with calibration and check of the start conditions takes place (a PV-surplus must be measured once). Unloading will not occur until the following day after MyReserve has detected a minimum surplus of PV energy.
  • Page 20: Myreserve Critical States

    (HF) and other gaseous intermediate products are relea- sed as well. Dusts of nickel oxide, cobalt oxide, mangane- se oxide (with NMC cells) must also be taken into account. Page 20 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 21: Instructions For Firefighting Measures

    • The battery’s heating value is approximately 140 MJ. with exposed metal parts and cable cores, there is a Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 21...
  • Page 22: Faq

    When the battery relay is open, the system’s internal opened, the system will be initialized to check whether energy consumption will be held to a minimum. Page 22 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...
  • Page 23: Disposal

    MyReserve or batteries contact your SOLARWATT certifi ed installer who will dismantle the storage system and cont- act SOLARWATT to arrange for pickup and disposal of the battery modules. Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018 Page 23...
  • Page 24 SOLARWATT GmbH | Maria-Reiche-Str. 2a | 01109 Dresden | Germany Certified as per DIN EN ISO 9001 and 14001 | BS OHSAS 18001:2007 Page 24 Subject to change | © 2018 SOLARWATT GmbH | AZ-TM-PME-0940 | Rev 004 | Version: 09/2018...

Table of Contents