7.4
WinCC Professional
7.4.1
System requirements
Prerequisites
You have created your TIA Portal project and the hardware and network configurations are
completed.
● Hardware configuration
– SITOP power supply (including the expansion modules)
– Controller
– HMI operator panel (Comfort Panel or Runtime Advanced)
● Network configuration
– PROFINET connection between controller and SITOP power supply
– HMI connection between controller and operator panel
You have integrated the SIMATIC STEP 7 blocks into your control project. (See chapter
Integrating the library blocks into SIMATIC STEP 7 (Page 101))
SITOP PSU8600 Firmware V1.4: Faceplates and Communication Blocks V2.4 for SIMATIC STEP 7 V14 SP1, V15 and V15.1 (TIA)
Function Manual, 11.2018, A5E37763954-09-76
Working with the library
7.4 WinCC Professional
127
Need help?
Do you have a question about the SITOP Series and is the answer not in the manual?
Questions and answers