6 Installation
Confirmation
Please refer to how to install gauges, displays, and sensors of each manual
as well as this manual.
6 -1. Installation diagram
ADVANCE
Control Unit
The meter wire can be connected to both two connectors of METER OUTPUT.
Up to 7 gauges and displays in all can be connected to one control unit. (Ex. If
7 gauges are connected to one line, none can be connected to the other line.
If three gauges are connected to one line, up to 4 gauges can be connected to
the other line.)
Do not connect more than one gauge of the same variety. (Ex. You can NOT
connect 2 turbo gauges together.) However, several ZDs can be connected.
A1
ZD
Switch unit
Sensor Wires
→Sensors
→Connect to vehicle
Power source wire
→Connect to vehicle
Meter wire
Meter wire
BF
RS
BF
54
ZD
CR
Need help?
Do you have a question about the Defi-Link Advance and is the answer not in the manual?
Questions and answers