Installation; Installation Diagram - Defi -Link Advance Operation Manual

Table of Contents

Advertisement

6 Installation

Confirmation
Please refer to how to install gauges, displays, and sensors of each manual
as well as this manual.

6 -1. Installation diagram

ADVANCE
Control Unit
The meter wire can be connected to both two connectors of METER OUTPUT.
Up to 7 gauges and displays in all can be connected to one control unit. (Ex. If
7 gauges are connected to one line, none can be connected to the other line.
If three gauges are connected to one line, up to 4 gauges can be connected to
the other line.)
Do not connect more than one gauge of the same variety. (Ex. You can NOT
connect 2 turbo gauges together.) However, several ZDs can be connected.
A1
ZD
Switch unit
Sensor Wires
 →Sensors
  →Connect to vehicle
Power source wire
→Connect to vehicle
Meter wire
Meter wire
BF
RS
BF
54
ZD
CR

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Defi-Link Advance and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF