Basic Installation - ABB Totalflow microFLO G4 Startup Manual

Flow computer
Table of Contents

Advertisement

Basic Installation

Step 1
Unpacking and Inspection
G4
The µFLO
and RTD are shipped separately in specially designed
shipping cartons that contain all of the relevant parts needed for
installation. Carefully remove the items from each carton.
Inspect for damage or missing or incorrect parts.
Step 2
Mounting the Unit
There are multiple ways to mount the unit. The following will cover a pipe
mount, wall mount and a direct mount.
2A
Pipe Mount Installation
1) Position the pipe mount on the meter run. The location needs to
be close to the lines and allows for easy access. Temporarily
attach the saddle to the meter run pipe using the associated
hardware.
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents