4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the pulse input module in any desired configuration.
2.
Wiring
Perform wiring of external devices to the pulse input module.
Page 26 External Wiring
3.
Adding a module
Add the pulse input module to a module configuration by using the engineering tool. For details, refer to the following.
GX Works3 Operating Manual
4.
Making parameter settings
Set the parameters of the pulse input module by using the engineering tool. For details, refer to the following.
MELSEC iQ-R Channel Isolated Pulse Input Module User's Manual (Application)
5.
Programming
Create a program. For details, refer to the following.
Page 29 OPERATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
4
19