Preparation Procedure - GE e-terrapowercom Installation Manual

V2
Table of Contents

Advertisement

3. Preparation Procedure

Apart from cables and connectors, modem's installation only requires a stripping tool and a 3 mm screw
driver.
Installation time may be less than 5 minutes.
Cables and connectors may be supplied along with the modem. If not, please refer to the recommendation
lists below:
Cables
AC Supply
IEC320 power cord
DC Supply
Two wires, 12 to 16 AWG (1.5 to 3 mm2)
Ethernet
Shielded Twisted Pair, Category 5
BPL signal
50 Ohms Twisted Pair, 12 to 16 AWG (1.5 to 3 mm2)
Ex:
AlphaWire 2432C (16 AWG)
Belden 5200FE (16 AWG)
Belden 5120FL (14 AWG)
Connectors (modem side)
AC input
IEC320-C7 connector
DC input
Plug, 2 pins, 5mm pitch
Ethernet
RJ-45
BPL signal
Plug, 3 pins, 5 mm pitch
Serial
Plug, 6 pins, 3,5 mm pitch
Proprietary – See Copyright Page
9
e-terrapowercom
v2 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents