GE e-terrapowercom Installation Manual page 27

V2
Table of Contents

Advertisement

3.
Remove the board from the chassis, pulling the power connector side.
4.
Locate filter bank jumpers JP100 and JP101 on both side of the filter component.
J100
5.
Place the jumpers according to the required filter combination (refer to table below and §5.3.2)
Proprietary – See Copyright Page
27
e-terrapowercom
J101
v2 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents