Husqvarna 326 E Workshop Manual page 49

Hide thumbs Also See for 326 E:
Table of Contents

Advertisement

5
48
Bevel gear/Cutting attachment
Assembling, oil pump end
Assemble the diff erent components in the
reverse order as set out for dismantling.
Check that the shafts can rotate freely.
502 50 18-01
503 97 64-01
Dismantle the bearings from the output
shaft (pump shaft) with the help of a small
bearing puller.
Assembling, oil pump end
Assemble in the following order:
1. Output shaft (pump shaft).
2. Input shaft.
3. Oil pump.
Lubricate the gear and the oil pump gear
with gear housing grease 503 97 64-01.
Heat the saw body to about 100°C and
slide both shafts in their respective posi-
tion and fi t the circlips (B) holding the ball
bearings.
Check the shafts to make sure that they
can rotate freely.
Push the oil pump into its position and
tighten the locking screw.
Fit the oil hose with the attached screen
and note how the hose is drawn.
Make sure the locking spring (A) tightens
the hose properly at the nipple.
Fit the oil pump cover and check that its
sealing ring is undamaged and does not
leak.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

326 ls327 es327 rjx327 ldx327 ls327 rx

Table of Contents