Figure 13. Cpe Outdoor Marking Dimensions For Wall Type - Samsung 5G CPE Installation Manual

Outdoor cpe
Hide thumbs Also See for 5G CPE:
Table of Contents

Advertisement

Perform leveling test before drilling by referring to System Leveling, to ensure the
positions marked are horizontal or vertical. If the result shows the marked
positions are not horizontal or vertical, modify the marking positions.
When the position to place the system is determined, place the system on that
position and then mark the positions where anchor bolts are to be fixed. This
reduces marking error range.
2

Figure 13. CPE Outdoor Marking Dimensions for Wall Type

3
4
5G CPE Outdoor Installation Manual v1.0
Copyright © 2018, All Rights Reserved.
Check the distance between the location for fixing the CPE Outdoor and the
anchor bolt hole, as shown in figure below.
[Rear View]
Place the mounting bracket on the fixing location, check the level status using
a level, and adjust the level of the bracket assembly.
If the level status is normal, mark the anchor bolt holes on the wall. This is
detailed in figure below.
2.49 (64)
Confidential
Chapter 2 Installing System
Unit: in. (mm)
: Anchor Bolt Hole