³⁾ Besides (future-) accessories, the additional QLINK port can also be used to connect to a second CDU Always connect the battery negative cable last when the installation has been completed. Enerdrive ePRO Plus Battery Monitor Installation Guide (Rev. 1.2)
Placement of rubber covers Battery configurations Please see the above illustration on how to cover unused ports of the active shunt module. A selection of rubber cover parts is included in the package. Enerdrive ePRO Plus Battery Monitor Installation Guide (Rev. 1.2)
Need help?
Do you have a question about the ePro Plus and is the answer not in the manual?
Questions and answers