This section explains how to connect PQF cubicles (Master-Slave or Slave-
Slave) when they do not come connected from the factory or case or on-site
extension.
The section starts with mechanical installation.
Electrical connections are then described: interconnections between cubicles
and with the supply
All cables needed to make the connections are supplied with the units.
7.2.

Mechanical installation

The side panels of the cubicles to be interconnected have first to be removed
(except the outside one of the Master and last Slave cubicles).
The provided divider panel seal has to be fixed on the interior frame between
cubicles.
Cubicles are then interconnected at 6 fixation points as indicated in Figure
3.1.
The baying kit is provided with the cubicles (not the tools).