CHAPTER 2
INSTALLATION PROCEDURE

1. Mounting of CPR

When the system is to be in redundant (dual) configuration, mount the CPR for the system 1. When the system is 4-
IMG configuration, an additional GATE card must be mounted in the CPR (see
Mount the CPR in the LPR and secure it with four screws as shown in
LPR
Figure 2-1 Mounting of CPR