Diamond DA 42 NG Maintenance Manual page 1279

Table of Contents

Advertisement

DA 42 NG AMM
Detail Steps/Work Items
(8)
Make a note of ordering numbers of the LH and RH joint sizes:
S D64-3217-23-00 Joint: x = 62 mm, z = 32 mm
S D64-3217-23-01 Joint oversize 1: x = 64 mm, z = 34 mm
S D64-3217-23-02 Joint oversize 2: x = 66 mm, z = 36 mm
S D64-3217-23-03 Joint oversize 3: x = 68 mm, z = 38 mm
Note:
Different part numbers may be used on LH and RH MLG of the airplane.
Doc # 7.02.15
Rev. 4
Figure 5: Main Landing Gear Joint Measurement
AIRCRAFT
Key Items/References
32-10-00
Landing Gear
Page 215
15 Mar 2018

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the DA 42 NG and is the answer not in the manual?

Questions and answers

Colin
March 16, 2025

How to access canopy locking system

1 comments:
Mr. Anderson
March 16, 2025

To access the canopy locking system on a Diamond DA 42 NG:

1. Open the inside door handle to access the spring pin.
2. Push the spring pin through the inside door handle using a 4 mm (0.16 in) punch.
3. Pull the outside door handle out.
4. Remove the 4 screws from the inside door handle.
5. Pull out the handle and disconnect the front fork head from the slide axle.
6. Remove the circlip and move the axle out.
7. Disconnect the rear fork head from the inside lever.
8. Remove the inside door handle from the canopy shell.
9. Remove the spring pin from the canopy door handle.

This process allows access to the canopy locking system components.

This answer is automatically generated

Table of Contents

Save PDF