Installation
Ethernet cable white (supplied)
Wireless router
(not supplied)
Gateway LED
Immediately power up the gateway, and after the LED initialisation sequence
15
(approx 1 min) the gateway LED will go green indicating that it has
successfully connected.
MON 10:20
ZONE 1
O
On
Auto
Tap screen to wake up
16
the thermostat.
MON 06:59
ZONE 1
O
On
Auto
20.5
Note. if the Touch thermostat is activated for some time, the temperature displayed may rise. This will
return to normal operation once all hand held interaction has ceased.
Gateway power cable (supplied)
Gateway (supplied)
indication
MON 06:59
!
O
On
Auto
Tap the triangle
17
to progress.
The display will now
19
show the home screen.
3 pin plug
(supplied)
ZONE 1
Tap CONTINUE to
18
complete setup. Note.
phone number is for
future reference only.
!
CONTINUE
9
Need help?
Do you have a question about the Touch Connect and is the answer not in the manual?
Questions and answers