Tools Required For Installation - Epson AN2WA87 Installation Instructions Manual

All-in-one collaborative whiteboard an2 series 87" and 100"
Table of Contents

Advertisement

Installation Instructions

TOOLS REQUIRED FOR INSTALLATION

1/8" (wood)
1/2" (drywall)
8mm (concrete)
6mm (concrete - AF6 toggler)
PARTS
9200-003827
A (1)
[Upper wall
bracket]
[Valence]
M (4)
10-24 x 3/8"
9200-003817
S (1)
[Boom projector mount]
V (4)
M4 x 12mm
GG (1)
[Whiteboard]
3/8"
7/16"
B (1)
[Wall hanging
bracket]
E (1)
F (4)
1/4-20 x 1-3/4"
N (1)
[Boom spacer]
P (1)
5/16"
T (1)
[Projector interface]
X (4)
W (2)
M4 x 30mm
10-24 x 1-3/4"
HH (1)
[Marker kit]
MM (5)
[Whiteboard bracket]
#1, #2
3/8"
7/16"
[Left valence bracket]
G (4)
1/4"
H (4)
1/4-20 Snap toggle
[Calibration marker
Q (1)
5/16"
#8-9 x 1-1/2"
U (1)
[Sensor cover]
CC (2)
#8 x 1/2"
Y (1)
5/32"
9200-003805
JJ (5)
KK (5)
#8 x 1/2"
Toggler AF6
NN (1)
[IR Cable]
D (1)
[Right valence
bracket]
C (1)
J (4)
1/4 x 2-1/2"
K (4)
Hilti Hud-L #8 x 60
QQ (2)
spacer]
AA (2)
Z (4)
3/16"
Toggler AF6
EE (1)
[Control panel
DD (2)
assembly]
#4-24 x 1/4"
FF (1)
[Marker tray]
OUTSIDE
LL (5)
#8 x 1-1/2"
[Leveling feet]
AN2 Series
L (10)
10-24 x 1/4"
[includes 2
extra]
R (8)
[4" cable tie]
BB (4)
BOX
PP (4)
5

Advertisement

Table of Contents
loading

Table of Contents