Operation
5.1 Before Powering On
5.1.1 Check Points
Once wiring has been completed, check the following points before powering on.
Check Points
Items
1
Attaching Units
2
Wiring
3
Connecting cables
4
Settings of CPU
5
Others
5-2
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
• Does the product name match the device list during the design stage?
• Are the unit mounting screws properly tightened? Is there any looseness?
• Has the dust-proof sheet been removed from the unit?
• Are the terminal screws properly tightened? Is there any looseness?
• Does the wiring of terminal match the signal name?
• Does the wiring have sufficient thickness for expected current?
• Is the cable securely connected?
• Is the mode switch set to "PROG."?
• Are settings for the card operation switch correct?
• Carefully check if there is any potential for an accident.
Description